Automotive · 2025
Flagship Dealership Campus
An 88,000 SF design-build dealership campus — showroom, 32-bay service building, and parts warehouse — delivered under a factory image-program deadline with EV charging infrastructure built in from day one.
Client: Multi-Brand Auto Group · Location: Inland Empire, CA
The project
A ground-up flagship campus for a multi-brand auto group: a two-story glass showroom, a 32-bay service and quick-lube building, parts warehouse, and full-site EV charging infrastructure — delivered design-build under a manufacturer image-program deadline.
What made it work
Design-build against a factory clock. Manufacturer image programs are unforgiving: brand-standard materials, factory-approved details, and hard compliance dates. EWB ran design-assist from schematic design, locking long-lead façade and glazing packages before permits issued.
EV-ready from the slab up. Conduit, switchgear capacity, and transformer pads for 24 charging positions went in with the foundations — not as a retrofit — saving the owner an estimated seven figures against a phase-two trenching approach.
Service bays first. Sequencing put the service building ahead of the showroom, letting the dealer’s fixed-ops revenue start four months before the showroom ribbon-cutting.
Outcome
Factory image-compliance sign-off achieved on first inspection. Campus opened on the announced date.
Representative case study — project details generalized pending client publication approval. Figures reflect a real EWB project profile.